What are the Differences Between IFC Drawings and Shop Drawings? (IFC Drawings Vs Shop Drawings) – IFC drawings and shop drawings both play an important role in ensuring the construction of the building is flawless, efficient, and seamless. But, both of these drawings are different and serve different purposes. Let’s dive in and understand what IFC drawings and shop drawings are along with their differences.
IFC Drawings Vs Shop Drawings: Main Differences
Before starting the difference between IFC drawing and Shop drawing, first understand IFC Drawings and Shop Drawings.
IFC Drawings – IFC or Issued for Certification Drawings comprise the final and approved set of construction design and documentation. The drawings go through rigorous and stringent feedback and review process, to reach this stage. These designs are the ultimate roadmap for all the stakeholders in the construction process. Their main purpose is to ensure construction execution, coordination, compliance, change control and record keeping.
Shop Drawings – Shop drawings are the technical drawings that contain all information related to the execution of the manufacturing or fabrication of wooden and other cabinetry things. All the materials, components, and joinery information are stated in these documents. The purpose of the shop drawings is to ensure better coordination between various trades and components of the project. Additionally, it makes sure that the product is built according to the given specifications and quality.
Shop Drawings Vs IFC Drawings
Let’s have a look at the differences between IFC drawings and shop drawings in a very simple and easy-to-understand manner.
IFC Drawings | Shop Drawings | |
Purpose | These are complete drawings and designs that have been approved and have been made for the certification process. | These drawings contain a detailed plan for executing the manufacturing of specific components. |
Prepared by/Used By | Architects and Engineers | Fabricators, Installers, subcontractors and contractors |
Level of Detail | High level of detail for every part of the building. | These drawings are highly detailed as various specifications such as material, joinery, assembly etc., details are mentioned. |
Lifecycle Stage | Prepared before construction begins. | Can be prepared during the construction Phase. |
Collaboration | Streamlines communication between and coordination between all stakeholders. | Coordination between contractors, subcontractors, fabricators and manufacturers. |
If you are planning to enter the construction industry, it’s important for you to have a good grasp of these IFC drawings and shop drawings. Interested to know more information related to “IFC Drawings Vs Shop Drawings”, stay tuned with us. Looking for a partner to get the best 3D rendering and designs done for your project? Renderspoint is the best 3D architectural visualization studio that you can trust and rely on. Call Now.